Rhodes Avenue School North London

NPS architects were involved in a multi-phase regeneration of this school. The project was ongoing for 4 years, and CAM was involved from beginning to end.

We have produced both new external boundary railings and internal railings to divide various areas of this large site, including the addition of automated security gates to the perimeter.

The main railings to the frontage incorporated the schools name in laser cut panels. The sloping aspect of the site made good use of our patented railing raking system. Both the higher external railings and the lower internal railings kept the same design features to create a consistent design.